Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

pls send me the 10 years technical question papers of NTPC
AND BHEL

Answer Posted / shailender gupta

also send me same

Is This Answer Correct ?    12 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please any one can provide latest aptitude test,technical test and interview questions for tata consulting engineering (TCE) i need it asap thanks in advance

2025


What are different type of instrument cable

2271


What is difference between “Fault Tolerant” & “Fault avoidance” PLC? Application where these system s are used?

3932


describe flow nozzel principle?

2518


what is cems analyzer explain with principle and drawing ?

2376


what is the procedure to callibrate temp controller ,pressure controller,etc. suppose a temp controller showing error 1.5 degree centigrate how can i minimize it.

2345


what is use of communication wire in multipare cable(oil and gas field), why this communication wire not used in single pair cable?

2155


What are primary elements of measuring pressure?

1281


how to calibrate and troubleshooting of leveltroll?

2183


Manipulation of dead wt. tester double piston type.

2054


field bus transmitter calibration procedure tell me

1828


A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?

1399


What is Cavitation in a control valve?

2063


can we copy the software from a transmitter using hht(hart 275) ?

2077


What are the interlocks we have to check during the start up of LP/HP compressor?

2003