hi
i want how to know how to explain the load runner process
please explain iam having the interivew
Answer Posted / narayan singh
Load testing typically consists of five phases:
1) Planning 2)Script creation 3)Scenario definition 4)
Scenario execution and 5) Results Analysis.
> Plan Load Test - Define your performance testing
requirements, for example, number of concurrent users,
typical business processes, and required response times.
> Create Vuser Scripts - Capture the end-user activities
into automated scripts.
> Define a Scenario - Use the LoadRunner Controller to set
up the load test environment.
> Run a Scenario - Drive, manage, and monitor the load test
from the LoadRunner Controller.
> Analyze the Results - Use LoadRunner Analysis to create
graphs and reports and evaluate the performance.
"Extract from LoadRunner Tutorial - 9.5"
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Which function is used to end a nested transaction?
Which components have you used in loadrunner ?
What is the need of checkpoints in lr?
How can we debug a loadrunner script?
What is the advantage of running vuser as a process than a thread?
What are the information contain by script windows for each script in the list?
How can we edit the vuser script?
What is the loadrunner start-transaction and its syntax?
What are the challenges that you will face to script the step “select all” and then “delete” for any mail account?
what is remote performance monitering?
What is loadrunner controller?
How are concurrent users differing from simultaneous users?
What are the three sections of a vuser script and what is the purpose of each one?
Which web protocol recording level generates the web_submit_form function?
What is a correlation?