Answer Posted / ahmed
There is lot of opening for fresh PP persons.
Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
What is collective order. Pre requisite of the collective order?
Which MRP types you have used?
what are the settings needed for variant configuration?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What is pi sheet
Explain the Difference between the Discreet and REM.
How do you get the system to update this value from the routing?
Explain what is routing in sap pp?
Mention what is the purpose of using capacity planning?
What is time phased Planning?
Explain the lsmw and the steps involved in them.
Can’t one material be assigned to more than one operation in a routine?
What are traffic lights in mrp?
Mention what are the types of master views for production and planning?
What is MRP Area or How can I excluede one storage location stock from MRP?