How to Calculate the maximum Demand required for a
connected load for a manufacturing Plant
Answer Posted / yogish
There is no specific method to calculate the MD from the
CL. It really depends on the following: -
1. Type of industry: Continuous or Batch process, Heavy or
Medium or Small
2. Mechanical load or Heating load or Furnace load
3. Plant at infant stage or stabilised
4. Standby loads included
5. Largest single load and its starting method
6. Possibility of staggering load without affecting
activities.
7. Whether the major motors are optimally sized or oversized
We can get at some figure, only by experience in a similar
industry.
| Is This Answer Correct ? | 41 Yes | 25 No |
Post New Answer View All Answers
How To increase Knowledge Of boliler regarding To Only Electrical Field..
Why synchorised generators are used for the production of electricity?
Please explain the following and how these are working with PLC unit 1.I/O Module 2.I/O Device 3.Adaptor Card 4.Ribbon Adaptor 5.RS 485-FC
how does directional relay work incase of ac ?
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
What is the importance of counter based plan & how is it scheduled?
what are the advantages and disadvantages of oil filled cables over XLPE cables
What is the difference between DOL starter and star delta starter
What is an automatic controller?
How to calculate the time setting for star connection in star delta starter? For example 10KW 3PH Induction motor.
How you calculating the 30 Hp 3 phase AC motor of power what size of cable is used for this motor?
What are the classifications of oscillators?
what are the possible reaons & remedies if resistance of NGR getting heat up
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
how to produsing geretor power