How to Calculate the maximum Demand required for a
connected load for a manufacturing Plant

Answer Posted / yogish

There is no specific method to calculate the MD from the
CL. It really depends on the following: -
1. Type of industry: Continuous or Batch process, Heavy or
Medium or Small
2. Mechanical load or Heating load or Furnace load
3. Plant at infant stage or stabilised
4. Standby loads included
5. Largest single load and its starting method
6. Possibility of staggering load without affecting
activities.
7. Whether the major motors are optimally sized or oversized
We can get at some figure, only by experience in a similar
industry.

Is This Answer Correct ?    41 Yes 25 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What types of high speed CMOS circuits have you designed?

1622


What is critical disruptive voltage?

828


DG SET BLOCK DIGRAM

1779


why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)

1996


How to check the cable fault / hv test of transformer cable.

1382






how power is generated,and transmitted to our home..pls explain briefly in simple words.

1769


ROC converges if poles and zeros lie inside a. Origion b. Z=1

1775


all the technical question with answers pleas send your email id ramar_eee@yahoo.com

1562


physical identification of HT & LT panel

1200


if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.

1125


importance of reactive power management

1575


what is the relative size of single and three phase?

1397


i ha done my 10th with 71% ,ITI with 81% 11th with 75% 12th 43% apprentiship with 71% in SAT i secure 1390 ,TOEFL 27 i was refused four times and in all me interview visa officar told that i am not Qualify for study in USA but i completed my 12th yes i got low persentage in my 12th but i seen to much student they already got visa with them 3 or 4 backlocs so why they are refused me ?

3050


circuit diagram of trip circuit supervision relay

1581


For some transformers we are using solid neutral earthing while some others we are using resistance earthing why ?

1455