Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is mix design

Answer Posted / sushant s das

Determine Cement quantity required for any required grade
of concret in present working condition that is Quality of
sand, aggregate & weather conditon.
OR
Depending on the condition of weather, quality of sand,
aggregate, water & etc Cement required for required grade
of concret is called Design Mix.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

punj loyed and sapurjl palanjl

2428


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

2591


What is need for setting limits?

1195


what pressure the NP2 class RCC pipe can sustain?

2752


What are the different softwares used for cad?

1353


A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

2064


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

3145


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1537


How to find out kg per Sft ?

2346


WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?

2094


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

3277


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

2404


What does a construction cost covers and what does not?

1257


plz.show development and anchorage length in simple diagram.

2618


explain five benefits of using standard terminology in the measurement process?

2232