Basic philosophy of applying 3P tripping for uptill 132KV
switchyards & for 132KV & above 1P/3P tripping is used.

Answer Posted / chandrasen mourya

Because most of the line used for transmission by EB are of
220 & 400kV . These lines are of lenght greater then 50 kms.
Due to which any arcing fault which is temp can trip the
line & total suhtdown. The 1p/3p trip with single shot or
multi shot AR is provided in 132kv & above.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if grounding is notdone at regular intervals for long distance transmission, will the load connected at distribution end receive voltage during negativehalf cycle of the sine wave?

1544


what is a bus riser in power system and why it is used

44121


what are the advantages disadvantages of connecting high voltage block( 1:1 transformers) transformers between the turbo generators and busbars.

1654


How may I enrol or get admission to your program?

1460


What is a advantage of Self Reset Lockout ? On Fault breaker get trip & fault no longer exist then self reset lockout how inform us?

1366






The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.

921


what are the things that can cause a three phase motor to crawl?

2860


could you measure current in parallel?

674


aternator every parts and its working

1169


how to calculate the change over time for star delta starter for different KW motor?

3739


how dia of wire and angles are calculated for overhead shielding wire to protect substation equipment from lightening strokes???

1562


can anyone explain 11kV 3core cable megger,hi pot test procedure with connection details?

2783


DG SET BLOCK DIGRAM

1779


What happen in ups if phase reverse?

1664


how is the testing of an REF relay? what are the test REF circuit having?

1443