Answer Posted / chandrasen mourya
Its Basically the requirement of the client.
ie. The client operationg load along with consideration for
future loads. This gives you the power, now for the Volatge
& current we have to do a bit survey regarding which
voltage level is available in the vicinity & the availibity
of the same from the electricity board. This gives us the
Volatge rating & current is now calculated.
Now we have to see what protection are required & depending
on that we select the no of cores in both The CTS & PTS.
| Is This Answer Correct ? | 5 Yes | 11 No |
Post New Answer View All Answers
Define ohm’s law for a.c (alternating current)?
What is open delta Xformer? It's adavntages & Use?
Which type of questions well asked. ?
How 48-relay (incomplete sequence) functions?
what are the difference between AC lamp and DC lamp
is there any lightning by passer is arranged in ship like buildings?
What type of pipe material G.I or M.S is used for sprinkler system?
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
hi frnds what is meant by harmonics & what is meant by third hormonics,where its will occur ?thank u
What is center gravity load in substation?
What are the common sources of energy?
What is the mechanism of WTI
For overhead protection we use which transformer?
How to decide whether A / B / C / D curve type MCB should be used?
Hello seniors m an engineering student in 3rd yr..i want to know what are the software course in electrical field?i wanted to do certification course but i dont know much about the course?..Regards