Answer Posted / k.jayachandrasekhar
CO-PRODUCT
------------
A co-product is a product that is produced in along with
other products. The system creates a separate order item in
the production order for each co-product. This means that
it is possible to display actual costs at co-product level.
Main product and co-product(s) are settled to different
receivers. Goods movements can be posted simultaneously for
all products manufactured in the order
BY-PRODUCT
----------
A by-product is a product that is produced along with other
products. The system doesnot create a separate order item
for each by-product.
The material valuation of a by-product is always based on
the price specified by price control in the material master.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
Define gaps.
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is the data you give in SOP
What is Material status and which view of the material master it is available?
In the monthly lot size proc, how to generate lot at the end of Period?
How to group employees for their allowances in payroll?
Explain Flexible planning Procedure?
Explain the process of Material costing.
Explain source inspection.
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
Where we have to specify the teardown time in one operation?
What do we do in the realization phase?
Scheduling times can be defined in the material master record by?
What parameters you maintain in “plant parameters” in configuration?