Ben can have a piece of work done in 8 days, Joe can work
three times faster than the Ben, Ram can work five times
faster than Ben. How many days will they take to do the
work together ?
Answer Posted / sivarama
8/9
ben 1 day
joe 3 days
ram 5 days
9 days work ,3 can do in 1 day
8 days work ..??
8/9
| Is This Answer Correct ? | 18 Yes | 4 No |
Post New Answer View All Answers
Time and speed time and work boat and streams
Two pencils costs 8 cents, then 5 pencils cost how much
debentures book building
There are 9 balls of equal size and same weight (they look similar) except 1. How may weighs required to find the dissimilar ball using a weighing balance?
r= 5 n = 3 . If first pole has 2 flags ,third pole has 1 flag how many ways the remaining can be arranged?
vernanlar : place :: finger print : ?
There are 5 red shoes, 4 green shoes. If one draw randomly a shoe what is the probability of getting red shoe
If the ratio of the areas of 2 queres is 2:1, then the ratio of the perimeters of the squares is
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?
A 16 stored building has 12000 sq.feet on each floor. Company A rents floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.
There is a room with 6' x 8'. A 1' tile is fixed along the 4 walls in one row. How many 1" tiles require to finish the work.
Conversation between two mathematicians: first : I have three children. The product of their ages is 36 .. If you sum their ages . it is exactly same as my neighbour's door number on my left. The second mathematician verifies the door number and says that the not sufficient . Then the first says " o.k one more clue is that my youngest is the youngest" Immediately the second mathematician answers . Can you answer the question asked by the first mathematician? What are the children ages?
"what category of job are you looking for and why"asked from an mep engineer.
For 1:2:4 ratios the weight of cement is 50 kg then how many kg are the weight of sand and aggregate?
There are 6 consecutive numbers P, Q, R, S, T, U, not necessarily in that order. Given that, Q is 2 less that P, P is 3 less that T and R is 2 less than S, arrange them in an ascending order.