Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In CDG type IDMTL realy O/L , E/F, O/C which are used for
out going feedrs,on R-phase o/c element, Y-phase , e/f
elecment and on b -phase o/c element will be connected .
Why the earth fault on center phase only, why not on other
two phases?

Answer Posted / gova

This is called 2 O/C+1E/F relay scheme.This scheme is used
mainly where the transformer connection is Dyn11.

please refer the current distribution in this transformer
when a fault occurs in feeder.

This scheme will be sufficient to clear the faulty
section.But nowdays 3O/C+1 E/F relay scheme also used in
many places

gova

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A cable with concentric PE conductor must be used with frequency converter circuits what does its means.?

1582


hi frnds what is meant by harmonics & what is meant by third hormonics,where its will occur ?thank u

2017


what is the preventive maintence for ht panels and busbars and vcb abd acb's.

2385


What is the resistance of the field winding of a d.c. Shunt generator kept low?

1117


How Self works in DG set

2039


how can maintaince the acb contactor moveing and fixing kit

2086


can a 150 kva 3 phase 440v/230V delta-wye step down transformer can be use as step up transfoermer with connected loads at 440v side?

1736


what is transient enclosure vltage , very fast transients, very fast transient over voltages

2158


limitation of conductor height on ground when we consider EMC

2058


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1806


what r substations?what r there work?why voltages r incresed and then reduced during distribution of power

1935


what is cathodic protection and why it use in industries?

2298


How to megger test 11 kV cable and the acceptance IR value

2989


Can u Explain about the electronic trivector meter and the use of data converters in them?

2371


what is the significance of tan&delta and how it performed in power transformer

1938