why we are not earthing ht cable at both the ends(sending &
receiving end)?
Answer Posted / j.kesavan
ht cables not connect earth propely current flowing through
the armours cable get more temp, thats why not connect earth
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
Dear sir, How to calculate 3.5 core pvc aluminium armoured cable meter wise carrying amps rating.Please give the solution with a good example.
how to produsing geretor power
what is the formula for computing cable tray size & capacity
What are the basic elements used for modeling mechanical rotational system?
Difference between shunt, PMG and AREP excitation. Which is the most reliable between PMG and AREP.
In both 600/1000 V cable and 450/750 V cable, we can supply 415 V. However for distribution, all utilities are using only 600/100 V instead of 450/750 V. What is the reason?
Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.
What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker
What is the form name of 'c' license, I want to download in web
How to arrange a hous hold earthing system to keep minimum earth resistance( below 7ohms).
what is the effect of change in supply frequency on load angle of synchronous motor,all other parameters remaining same?
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz
sir i have cleared the apti test of EIL held on 15th march and my interview will be in new delhi on 2nd june.i will be very much helpful if u help me regarding the type of interview questions comes at EIL.(URGENT.........PLZZZZZZZZZZ...............)