WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN
DISTRIBUTION LINES?
Answer Posted / felixraj
in distribution s/m poles height was not more.LA at tfr end
mainly to protect tfr winding and sub-station equpiment
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what are the usual topology of transformers at different substations in the power system and why that particular topology is choosen. what are the limitaions of that topology?
Can we use Ccapacitive voltage transformer directly for metering purpose?
In synchronous motor, how the field current is related to armature current..i know its inversely proportional..but concept wise...i was nt clear....pls help me...
Difference between a pilot wire and a normal conductor?
if we have 320KVA Genset kindly advice how much load we can put it.
What is the direction of current flow in ct secondary...means if the current is flowing from P1 to P2 then what will be the direction of current flow in ct secondaryw
how to make an earthing certificate
Q) Write VBscript code along with QTPscript code in QTP tool for below scenario 1. Launch yahoo site(i know) 2. Do loogin(i know) 3.Click inbox link(i know) 4.Go to every page of mail box and count no.of read mails and no.of unread mails(i know) 5.Store page numbers, read mail count and unread mail count in a new excel file sheet 6.Create 10 types of graphs on that data 7.Do logout and close site(i know) 8.Save new excel files with graph
we have 3 single phase transformers. how will we generate 6 supply from 3 phase supply input
At full load wat is the motor p.f And at no load will is the motor p.f?
How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?
how to measure dc earth leakage current?
how many joints are allowed in underground HT cable of 1 KM
Name of the relay of low lub oil presuure in DG sets
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.