Answer Posted / badr khalaf ambusaidi
pile foundation is one of deep foundation type
we used alwayse this type when the depth of foundation (Df)
more than width of foundation (B) that in ganarl
but the most of stander call we used pile foundation when
the depth (Df) more than 3m
it is like thin colomuns and the transfe the load by three
tybe
1 end bearing of piles
2 skin friction
3 composit method
Is This Answer Correct ? | 11 Yes | 16 No |
Post New Answer View All Answers
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
what are the ffactors you considered choosing the course?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
material used for mendrel use to bend epoxy coated rebar
five benefits of using standard terminology in the measurement process
what are the values of compressieve strenght?
IS code for grade of concrete for bamboo lintel????
How and where are aqueducts built?
important question on stones
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
residential buildings,mixing of concrete,structural,construction material,site handling.
Explain why concrete barriers have curved surface profiles?
how to calculate the steel in 500yard
how to calculate valuation for the old building?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.