what happen if we give 220 volts dc supply to d bulb r tube
light?
Answer Posted / usmanaslam271
If bulb's rated AC voltage is 220 volts then it will work
on 220 volts DC as well.
Is This Answer Correct ? | 42 Yes | 19 No |
Post New Answer View All Answers
we have two generators different capacity on 15 MW and other 6MW at 11 KV , 15 MW gen. bus short level current 40KA,and 6MW short level current 25KA,, length of cable 100MTR between 6 MW from 15MW gen. for bus coupling . kindly tell any one can we use both NGR OR one NGR from any GEN. BOTH NGR has diff. rating. Tariq pakistan
Can u explain : what is supply for train (whether a,c or d.c ).I know that supply is 25000v a.c .But there is rumour that supply is D.C. And also explain how lights and fans inside the trains are working ,and what type of motors are used in trains whether D.C motors or induction motors .If d.c motor, how it gets supply.If traction motors are used then what are traction motors and its functions and how it differs from other motors and also explain about locomotive . y d.c series motor in train.train wheels r driven by D.C shunt motor ,at what voltage,and at what speed. please reply..............
Hoe do calculate the Cable size for Amps rating ?
what is the synchronous timer ? and it applications.
how much value of resistance should connect to 15 kw, 6 pole 3 phase slip ring induction motor having RV-240, RA-42.
How we select the vector group of 3phase power transformer?
HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com
What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.
what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.
What is nyquist contour?
HOW TO CALCULATE EARTHING SIZING?
When lag/lead/lag-lead compensation is employed?
How to calculate no of EARTH PIT? Describe the formula as per IS standard?
How to select the gauge of wire for winding of motors? How to select number of turns for winding of three phase induction motor?
dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?