Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

TO operate transformers in parallel, vector symbol of the
both should be same.If one transformer name plate is not
there, how can we conclude that whether the transformer is
having the same vector symbol or not?

Answer Posted / rajendran

we can easily find out and confirm the vector group of the
transformer by using the standard test procedures.

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Do closed loops systems require manual input?

1264


I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.

1878


what is zinc diffusion?

2165


what shall be no load voltage of 132/33 kV transformer ? is it 33 kv of 34.5 kV

2241


what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?

2752


IF % IMPEDANCE OF A TRANSFORMER IS INCREASED FROM 5.8% TO 8% HOW MUCH THE EFFICIENCY OF THE TRANSFORMER WILL COME DOWN?

2410


what is the problem when i want to close a circuit breaker by local position it closes well.but when i close it in remote position it trips

1658


when the Transmission and Distribution network where is the "feeder" lines are located? and why should be used in T&D network.....

1818


how to test and calculat the head and discharge in borewell compressor

2204


How can ou verify the size of conductor 50Sq.mm ACSR

1993


How to test REF relay testing for LV panel as per Kahramaa standard?

4992


In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem

2014


What is the estimated total hydropower potential of india?

1191


what are the components in electrical control panel (for example: 415V, 3-ph, panel to operate utility and 3-ph DG set).

2078


WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?

2335