Answer Posted / gurudutt sharma
Maximum Demand is a Total load end output after losses such
as powerfactor
| Is This Answer Correct ? | 0 Yes | 9 No |
Post New Answer View All Answers
What happens if we give the supply to the rotor of induction motor and make its terminal shorted?
We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.
I have a drawing of a wound rotor induction motor for a crane. This crane motor has 5 forward speeds & 5 reverse speed implemented of course with different amount of resistance for each speed setting selected. What has got me scratching around is the fact that 8 of the 10 speed selections switch in uneven (unbalanced) amounts of resistances on each of the 3 connections to the motor's rotor.Can this be possible? I would have assumed this would produce unbalanced rotor currents and therefore vibration in the motor. I would greatly appreciate anyone's comments on this. Many thanks, Confused.
What are the basic elements used for modeling mechanical rotational system?
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
how we calculate the dick for a pole?
give me atleast four differences between circuit and network
DEAR SIR/MADAM,CLEARLY EXPLAIN ABOUT CRAWLING AND COGGING EFFECTS IN INDUCTION MOTOR.
The inventer is a battery, but if lost current at home u will turn on the fan but the is AC and inventer battery is dc . Then how the fan was rotating. What device Or machine in fan converst the Dc power to Ac power
What is core CT & it's function?
What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?
How can we calculate cable size in Low voltage & high voltage
if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?
the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?
what are the protecyion of transformer & generators