Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN
FROM NEARBY GRID AND GIVING THE SUPPLY TO THE GENERATOR
WHICH ACTS AS MOTOR. WHAT IS THE NEED OF RUNNING THE
GENERATOR AS MOTOR?

Answer Posted / natrajan tt

normally nobodies given to the supply directly to the
generator.In a power plant installation time they are drawn
supply from grid and given to the step down transformer like
11kv/430v for boiler and turbine auxiliaries startup use,
otherwise if ur possible to giving the supply to generator
it will act like a motor.Breaker capacity & Cable size or no
of runs to be added.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is voltage ratio of a transformer?

1246


What are the basic elements used for modeling mechanical rotational system?

1151


100 MVA 3-phase alternator with earthed neutral has a reactance of 5 ohms per phase. what will be the fault MVA of generator.

2419


What is touch potential and step potential?

2231


What are the types of the glands and difference between single and double compression type of cable Glands.

2127


why we have to particulary use ACB for below ratings,even available of MCB,MCCB with that range ?

2977


what are the applications of PLC?

2014


What is the RMS and DFT principle of analogue maesurments. Which way they are advangages. where which princples give optimum results.

2736


substation+ plc system

2129


Can anybody just suggest about the scope of Electrical design with ETAP software?Just guide me?

3856


how we calculate torque ? how we improve it ?where torque will either motor or generator ?

2110


why we can use 1 to 5V dc

2004


what is difference between 2 pole structure and 4 pole structure in transformer yard

6136


I need a formula to calculate the size of cable as per load but in the terms of length. Please Reply me as i search lot of sites but i did not get the answer.

2135


what you have to see after one week or month from the day of installation of transformer ?

1753