As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / narendra
a. If building is underconstruction
1. see if errors are seviour or not
if yes do reconciliation with experts
if not anlyse losses and make possible
corrections
2. if errors are serious reconstruct entire part or
whole but at any cost do not leave as it is. you can re
embers cost from others but not at the cost of structure
and human life which are supposed to dwel in it in future.
b. If building is complete
1. check the errors, whether are with immidiate
affect to stability of structure, if errors are serious
find solution with experts and immidiately do needful with
SOS situation.
2 if errors are causing no immidiate effect like
leakages, crcks, loose tiles etc. do reconciliation and get
the problem solved.
Any way, on top priority see that specification errors are
not affecting structural stability and then functional
stability and lastly aesthetic sence of the structure, in
nut shell.
2. If errors are not so serious
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Why should pumping be not used in case of concreting work?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
Explain the different types of roofing systems?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Describe Briefly The Various Methods Of Concrete Curing?
Why Vitrified tile are getting pop up.
what is the difference between natural draught cooling tower and induced draught cooling tower
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What is the difference between routing maintenance and major maintenance in school facilities?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
calculate the quantity of water for 1:6 cement mortar
what is m30 in concrete tiles
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?