Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the design mix? What is the proportion for M25,
M35, M40 concrete mix.

Answer Posted / rakesh

Design mix is to attained the specific strength of concrete
in 28 days .M25 means whos Cube test results are 25N/SQMM
after 28 days.Proportion in Different grade of mix is
decided by Trial mix in Lab,For which there is different
cement values.

Is This Answer Correct ?    52 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When column of building is abutting the boundary line,then suitable footing advised is

2512


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

1381


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1459


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

2693


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2920


Different sizes of Hollow blocks and its weight. Thanks.

2390


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2115


what energized you to complete your course?

2387


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

5138


What is the origin of name railway sleepers?

1304


What things you need to take care of before building a kitchen island?

1137


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

2340


What is passive earth pressure ?

1159


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

1218


Please tell me vasthu room sizes. Thanks.

2193