which concrete grade has highest strenth and what is its
comosition?
Answer Posted / guest
M 25 AND 1:2:4
| Is This Answer Correct ? | 15 Yes | 56 No |
Post New Answer View All Answers
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
how pumping of concrete effects the quantity of material used in it?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
What will you do if a portion of load bearing wall collapses under your supervision?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
what is anchorage length,lap length and (dont remember the last one)
What is horizon or horizontal mining?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
explain fie benefits of using standard terminology in the measurement process
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon