What is C check in a diesel generator and what are parts
and what has to be done during the C check
Answer Posted / shri..
Major thing in c check is that gap in between inlet valves
& rocker has been check & maintain, the end clearance of
crank shaft has been check & maintain. + B check also
carried out in c check.
| Is This Answer Correct ? | 24 Yes | 7 No |
Post New Answer View All Answers
how to remover corona effect and hysteresis losses from contactor
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?
After doubling voltage from solar cells & use step down voltage transformer can we get high current output with low voltage.
i have some screw comprressor with 630kw power,i have established them with simple star to delta circuit,by the way there is so much inertia when the screw comprressors start, can you offer me contactors power with 400vac or any cataluge to choose the contactors
What is the method of estamating of cable, CB,MCB ?
What kind of Neutral CT can be placed in 11/0.433KV transformer to be used and what are its specification?
what are the interview question asked in wind mill about electrical
EXPLAIN METOD OF IMAGE OF TRANSMISSION LINE/ WHAT ARE ITS PRACTICAL APPLICATION?
1. What is maximum permissible distance between smoke detectors ? 2. How do we decide number of smoke detectors required in a large office, warehouse, hall etc ? 3. What should be maximum height of smoke detectors ? 4. Where do we use heat detector, optical smoke detector, temperature sensitive detector ?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
why need to be maintain power factor for industrial customer?
what & how to check the lightning arrester
what is v/f control in VFD?