Answer Posted / prasanna
A requirement linked to a demand is called a pegged
requirement.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Mention what is the t-code for changing production order and to display production order?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Can’t one material be assigned to more than one operation in a routine?
What is the use of t-code cs20 in bom?
What is scope of planning?
Mention what is the production process in sap?
How can I use variable size items?
What are the types of MIC?
Can't one material be assigned to more than one operation in a routing?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Difference between standard cost and variable cost.
Explain LTP.
what are the constraints of Variant configuration?
Explain Planning file entry.
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?