while extending the material master view after saving error
is coming that the field material number is defined as a
required field,it doesnt contain an entry. After selecting
that it is showing the particular material may be locked.
Pls do the needful.
Answer Posted / vikram patil
You have need exit from material change session
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Explain In-process inspection.
How to insert an inspection checkpoint at the end of an operation?
What are all the steps involved in Variant Configuration?
How to create opbject dependencies in a bom for a configurable material?
What is costing? How it is affected the pp?
• How are basic order dates determined?
Mention what are the keyfields found in mrp view 1?
What is Auto GR?
Overlapping and splitting, where do you assign?
Define 'sop' (sales & operations planning)?
Define mrp group
Different types of consumption based planning.
What is the use of sap material view and list out other parameters where sap material view is applicable?
what do you mean by planning time horizon
Integration between PP and QM Module.