Answer Posted / raghukar
there are 5 basic elements of condition technique :
1. creating condition table(s),
2. placing the condition tables in Access Sequence,
3. assigning the Access Sequence to Condition Type,
4. creating the Procedure,
5. Placing the Condition type in the Procedure.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is the 'storage location rule'?
What is sales and distribution (sd)?
IF u have worked on EDI IDOC, while sending PO to vendor how u connect to the system. Tellme the entire design and steps of the screen. how it looks.When i told we need to create port, partner profile, outbound idoc process. Interviewer not satisfied.
Can any body can give me the example for business scenarios in industry specific solution you work with for sap sd interview bez I just finished the training.
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
What and where types of copy controls we change
What is an option by which we can run all the sessions in a batch simultaneously?
How have you used MASS tool in your last project, and to upgrade what data?
What is product attributes?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
Can anyone tell me please how is the availability check carried out, how is availability working out in your job business, how is the ATP (availability to promise) is configured?
What is alternative condition base value? Give an example?
Have you worked on ABAP Queries? Explain the detailed work mechanism involved in it? Please give examples from your real time/ live data project along with detailed procedure/ work mechanism and explanation along with path and t-codes if any? Please answer this question asap.... Its Urgent.... Looking forward for your express reply...I have interview within 1-2 days. So, give reply to this query asap.. I would be very grateful to you for your timely help.Thanks in advance. Regards
Plant to plant is handled using mb1b. If stock transfer orders with deliveries are configured, use me27.
What is the 'consignment stock process'?