hi vishok this is noor plz tell me what type problems will
occured i use T/C in the place of RTD in (FEED WATER
TANK),plz send ur e-mail address to my ID
(mail2noor.hyd@gmail.com)
Answer Posted / vk
I m sure T/c cannot replace a RTD. Because the o/p of T/C
is in terms of voltage(milli volts) while RTD changes its
resistance with increase of temperature. so the driving
circuits are differentin both cases.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the meaning of wet leg
hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.
What is hp & mp seperator .& what is its working principle ?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
how many types of preheaters are in cement industry & what r they can any body explain?
I have got a call of IOCL interview for projects having 2yrs experience. What sort of questions should I expect in the interview?
If P will increase then what will happen with PID?
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.
for oil & gas industries which zone is normally preferred? why? give its example?
In VVVF DRIVES VOLTAGE IS ALSO VARY WITH THE FREQUENCY. HOW? WHAT IS THE DIRECT FORMULA RELATING THESE TWO.
How does your previous experience relate to the job you are applying for ?
What care will you take in the installation of control valves,SCADA,DCS and FOC in Oil and Gas Project?
Can anybody tell me how to select the size of earthing cable for DCS & PLC system.Please tell me any relevant answer here or mail it to me.
what is piezoelectric transducer?give an example in power plant n state its principle?
Which are all the commonly used Bordon tubes in the pressure gauges. Do any one use ASTM A 312 tubes for this purpose?