Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what the role and resposibility of mech engg in power plant
project.

Answer Posted / n.s.patil

A Mech. Engr.Can better manage a power plant

Being a mechanical engr,always look at the systems or the
equipment with a high level of performance efficiency and
operate with minimum breakdowns, taking into account the
timely pre-planned maintainance schedules.

A mechanical engineer has studied in his engg. course all
aspects of power generators such as (1) IC
Engines,pump,turbo charger,Filteration system
(2) Heat Transfer (3) Basics of electricals and some basic
knowledge of electronics.Can manage the POWER PLANT much
better.

All that needs is to understand the generators operation
and maintainance part and be able to communicate concerned
department effectively,hence a Mech. Engr.is an effective
to manage the power plant

Role and responsibility : manage the operating work
force ,monitor the daily health checks of generators,pre-
plan the preventive maintainance schedules,generate
necessary spares parts list.Strict follow up on
Daily,Weakly,Monthly,Half Yearly and annual maintainances
Etc.

Is This Answer Correct ?    24 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

My vendor filled liquid oxygen in our 11000 liter capacity tank. He filled from 1400 MMWC up to 3200 MMWC. I followed the provided conversion table and found that we had been supplied 1800 MMWC liquid which is going to yield 2815 cubic meter. On the other hand, the vendor claims that he supplied as follows:- 5236 cub mtr(3200 MMWC)-2124 cub mtr(1400MMWC) = 3112 cub mtr. I fear that he wants to charge 297 cubic meters extra. He claims that my method was wrong and his was right. He says that this disparity is because of the conical shape of the base of the flask. I will be thankful if somebody can explain me the truth.

3309


whether anyone has VEDANTA written question papers?if so send me soon i've placements in dec 2nd week

2212


Name the indicator diagram.

2225


How the thickness of thermal boundary layer and thickness of hydrodynamic boundary layer related ?

1007


what is difference between fan and blowers

2409


in regenrative cycle why to use two liquid(water&mercury) on steam genration cycle.

1689


What's the difference between absolute vibration & relevant vibration regarding Boiler Feedwater Pump ?

1809


Methods to dry up wet induction motors?

1978


What is the percentage of chromium in 18 : 4 : 1 iiss ?

997


What kind of materials should be used for shafts manufacturing?

920


When was the first space rocket built?

1173


What are the defects in exhaust valve?

2125


State the laws of thermodynamics and its importance of in mechanical engineering.

1043


What are the causes if one cylinder in a diesel engine has a high temperature?

1955


what is cswip?

8810