Is it possible to save incomplete document?

Answer Posted / mahesh

YES U CAN SAVE BUT IT CANNOT BE PROCESSED FURTHER IF
REQUIRED OR MISSING INFORMATIONS ARE NOT FILLED.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does the account group of the customer control?

623


I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.

1654


How can we set up to have the vat# be accepted in the ship-to master file data control screen?

615


How can one inactivate or block a special stock partner? Intent is to disallow transactions to this consignment location as part of lifecycle mgmt.

1502


Give examples for standard output types in sd.

640






customer hierarchy in sap sd for account determination

3128


what is the use of billing report

1450


How to transport change request from one client to another client in sap ? : transportation management

620


is LE module is better than SD module to get a job in SAP? becouse i think sd consultant are more than LE is it?

1788


When we include a new customer, we have to maintain condition record every time or there is a process by which we can validate the condition record to that new customer belonging to the same sales area?

1466


At what places availability check performed? is it done at invoice level also ? if yes what are the scenarios to perform availability check at invoice level? what are the settings to be done to perform to check at invoice level?

1121


Can you assign two different sales organization to the same company code?

604


When you create a credit memo request do you always have to refer to a sales order or any other previous document?

740


What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling

434


in material sub stution when we sell the sub stute material with main item price it will display the list of materials with main price or only one substute material is substuted automatically in first senario i practed it will display the list of materials but price taking it's oown price.in 2 case substute item is picking main item price but it is possible for only one substute item only.may question is it possible to display list of material case 2?thanking you in advance

1568