Answer Posted / mahesh
YES U CAN SAVE BUT IT CANNOT BE PROCESSED FURTHER IF
REQUIRED OR MISSING INFORMATIONS ARE NOT FILLED.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What does the account group of the customer control?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
How can we set up to have the vat# be accepted in the ship-to master file data control screen?
How can one inactivate or block a special stock partner? Intent is to disallow transactions to this consignment location as part of lifecycle mgmt.
Give examples for standard output types in sd.
customer hierarchy in sap sd for account determination
what is the use of billing report
How to transport change request from one client to another client in sap ? : transportation management
is LE module is better than SD module to get a job in SAP? becouse i think sd consultant are more than LE is it?
When we include a new customer, we have to maintain condition record every time or there is a process by which we can validate the condition record to that new customer belonging to the same sales area?
At what places availability check performed? is it done at invoice level also ? if yes what are the scenarios to perform availability check at invoice level? what are the settings to be done to perform to check at invoice level?
Can you assign two different sales organization to the same company code?
When you create a credit memo request do you always have to refer to a sales order or any other previous document?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
in material sub stution when we sell the sub stute material with main item price it will display the list of materials with main price or only one substute material is substuted automatically in first senario i practed it will display the list of materials but price taking it's oown price.in 2 case substute item is picking main item price but it is possible for only one substute item only.may question is it possible to display list of material case 2?thanking you in advance