Answer Posted / nawzan
pile can be defined as a column insert in the ground to
transmit the structural load to a lower level subsoil
| Is This Answer Correct ? | 18 Yes | 26 No |
Post New Answer View All Answers
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
Mention what are the composition of a landfill?
what is thumb rule for calculating the size of ISMB required for a particular length of span
In case if concrete box girder bridges how is the number of cells determined?
How do you calculate the power of a centrifugal pump?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
Define What is the force exerted by the Tacoma narrows bridge?
What is packing Factor ?
What is horizon or horizontal mining?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
give me the rate analysis for Bituminous Macadam and SDBC
What is the purpose of the gap in the road on this bridge?
pls give me ans to ACT formula cube testing porpuse
what is the service corridor?