AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN
FROM NEARBY GRID AND GIVING THE SUPPLY TO THE GENERATOR
WHICH ACTS AS MOTOR. WHAT IS THE NEED OF RUNNING THE
GENERATOR AS MOTOR?
Answer Posted / bikash c pal
I think The question who have asked, wanted to ask that "AT
THE TIME OF START-UP A POWER PLANT....." & NOT "AT THE TIME
OF INSTALLING THE POWER PLANT ...."-------------If my above
assumption is true, then the answer WILL BE as follows :-
TO BRING THE GENERATOR NEAR TO SYNCHRONUS SPEED DURING
START UP.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how to enter inverter parameter? without manaual?
difference bewteen reverse current and alternating current
what is the difference between Central Battery System and UPS in applications and uses? and why UPS suitable for Computers and central battery for emergency lighting?
What is the difference between indoor and outdoor transformer
what should be the ideal gauge of wire (In sq mm) for different loads in Ampere?
How to Decide the Location of Earth pit for Compressor in Oil Depo? and How to measure the resistance of earth pit Pls explain me with the help of Circuit Diagram?
how we findout a ignater is faulty or not?
what is mean by dual digital protection in the relay field?
SUTIABLE FOR ohm's law super conductor
what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?
what is high - pot test. what's its use?????
What are the different towers used in 132kv transmission line? what are the differences between the P,R,S towers used in 132KV and detailed explanation
Actuality I have at home electrical panel with 220v 50hz, and I want to converter from there to 110v 60hz, to wiring on the half of my house. Also I like to keep another half of my house with the original 220v 50hz. What is the best and safety way to do?
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
all details of DG UPS HVAC