Formulas used for LT side:

Full load current = KW/(KV x sqrt3 x PF x η)

Voltage Drop =
sqrt 3*IFL*(R COS Ø + X SIN Ø)*L/(KV*10000*N.R.)

where

IFL = Full load current of the Load connected in Amps
KW = Rating of the Load connected
KV = System Voltage
R = Resistance of the cable in Ohm/Ph/KM
X = Reactance of the cable in Ohm/Ph/KM
L = Length of the cable in meters
N.R = No of Runs of the cable
cosØ = Power factor of the system
PF = Power factor
η =efficiency


Voltage Drop =
sqrt 3*Ist*(R COS Ø + X SIN Ø)*L/(KV*10000*N.R.)

where Ist=starting current which can be 6 times the FLA of current.In technical term it is called as LRC(locked rotor current)


HT side:

Full load current = KVA / KV x sqrt 3

Short circuit current :
A = Ish x sqrt(t)/ k


Where
t = short circuit time in sec
k = constant
A = Conductor size in Sqmm
Ish = Short circuit current in Amps
Derating Factor :

Ambient temperature correction factor for cables laid in 0.9 Trays at 50 degree C = 0.9

Group derating factor:

Multi Core cables
Cables are laid with a spacing of one Diameter and routed in cable trays and trays in tiers by 300mm =0.9
Ageing factor= 0.95
Therefore the Total derating factor = 0.9 x 0.9 x 0.95 = 0.7695
Total Derating Factor= 0.77



The rest calculation for voltage drop are same as that of LT side

Is This Answer Correct ?    8 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why would the rotor rotate at sub synchronous speed against the direction of rotating flux when d rotor of 3 phase IM is connected to 3 phase balanced supply and the stator windings are shortcircuited ??

1523


what are the principles of a booster converter?

1554


i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.

1534


hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /

1506


Why Utility Distribution System in India is mainly at 11 kV? Why not Utility go for 33 kV?

1301






would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......

2015


WHAT ARE THE DISADTAGES OF SINGLE-WIRE-EARTH-RETURN SYSTEM USED FOR RURAL ELECTRIFICATION?

1472


How to decide the size of the capacitor for a single phase induction motor say 2 HP ??

1638


how to select size of hardware for linking aluminium busbar is it depend on area of busbar or current flowing through bus bar

1523


i have gear oil pump with single phase motor.some time its motor starts running in reverse direction rather than forward direction...whats the reason behind this issue. 1- either capacitor is week? 2- or winding is week?

831


What is a signal flow graph?

628


how does grading rings & spacers in transmission line works? Working Principle?

1588


What is capacitance?

717


How time response of the system is divided?

678


how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you

1507