which software better design in structure design or Rcc
design(STAAD PRO,TEKLA STRUCTURE)

Answer Posted / shamsul

Dear Sir,

There is a new software called as ESTEEM that can analyse,
design, draw the beam, slab, column, footing, piles details
automatically + cost estimation.

This software cover BS 8110 code, ACI and some other codes.

If you want, u may email to me to obtain it.

Is This Answer Correct ?    52 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the ingredients of pre-stressed concrete?

768


1m square 20mm plastering how much of water need curing work

1453


Define What is an ice dam sock?

681


what is escalation?how it is done?

2088


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

634






in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

3334


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

1833


Describe the advantages and disadvantages of using plastic and timber fenders?

657


A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

1482


how can calculate cutting length of diamond ring

1361


a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

1654


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

1911


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

1769


silt%= silt volume/ silt+sand volume is this right?

1496


sir please send me campus placement questions in civil engineering

3119