Difference between Verification & Validation?
Answer Posted / kasturi
Verification -> Are we building product right?
Validation -> Are we building right product?
- Verification evaluates documents, plans, code,
requirements, and specifications.
- Validation, on the other hand, evaluates the product itself.
- The inputs of verification are checklists, issues lists,
walkthroughs and inspection meetings, reviews and meetings.
- The input of validation, on the other hand, is the actual
testing of an actual product.
- The output of verification is a nearly perfect set of
documents, plans, specifications, and requirements document.
- The output of validation, on the other hand is the
actual/perfect product.
=> Verification comes before Validation.
Is This Answer Correct ? | 111 Yes | 10 No |
Post New Answer View All Answers
Can you explain the various elements of function points ftr, ilf, eif, ei, eo, eq, and gsc?
Describe a past experience with implementing a test harness in the development of software.
Why performance testing is performed? What are tools of performance testing?
What is neutral test case?
What is application programming interface (api)?
what exactly is heuristic checklist approach for unit testing?
What do you think the role of test-group manager should be? Relative to senior management?
how to explain banking domain project in testing?
What is deferred status in defect life cycle?
What are the basic forms of variations?
1.What is configuration Management? 2. Explain Impact Analysis 3. Explain Peer Review 4. what i kickoff phase of Formal Review. 5. Whatv are the phases of fundamental test process. 6. what is state transition testing. 7. what is LCSAJ 8. Test conditions are derived from where?
what is the common in all s.o.p (standaed operating procedure)?
Any one please can u tell me what is composer? An interviewer asked me do u have experience in Composer? its urgent.
What is six sigma?
Have u ever done testing related to a database,give examples to support u r answer.