why reinforcement is not provided at centre for beams r column
Answer Posted / raghuram
MAIN PURPOSE OF REINFORCEMENT IN BEAMS IS TO RESIST TENSION
IN THE LOWER FIBRES BELOW THE NEUTRAL AXIS. AS THE TENSILE
STRESS IS 0 AT THE CENTRE AND INCREASES LINEARLY TO THE
BOTTOM FIBRE WHICH INDICATES THAT MAX TENSILE STRESS IS AT
THE EXTREME FIBRES SO REINFORCEMENT IS NOT PROVIDED AT THE
CENTRE
| Is This Answer Correct ? | 54 Yes | 4 No |
Post New Answer View All Answers
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
How to calculate chejja reinforcement
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Cement consumption of one cubic meter of aerocon blocks masonry?
from where ican get sample papers for CET-delhi 2012
The portion of a brick cut across the width is called?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
What is the use of water table & Kreb stone for drain
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
How do we calculate absolute pressure?
how many material required for brickbat water proofing of toilets.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?