Answer Posted / harekrishna mishra
Mix design of concrete is the method suggested By IS to
design the proportion of different ingradients of concrete
in order to have desired strength of CC with MINIMUM use of
cement and use of LOcally available materials(fine and
coarse aggregate).
IS code suggests use of mix design for concrete mix more
than M20 grade.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
How do you calculate the power of centrifugal pump?
What is kn measurement?
What black man invented the clothes dryer?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What are the materials used in building a gravity dam?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)