If Technical manager is not addressing to bugs while
releasing the project , then how u can treat that bugs?
a.open b.closed c.pending 4.deffered
Answer Posted / koteswara rao.k
here communication gap is missing hope while i am seeing
the question .
1. Technical manager is not addressing the questions means
it is not effected the present promote system at all , on
that situation keep status as differed .
2. In case it is affected the system and current
requirements put the status as pending .
perhaps this will not happen because of perfect planning
and scope of requirements in documented wise .
Any thing wrong koteswara.9.rao@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to generate swift message
How Google apps can be considered ? Either they are product or Project
What is backus-naur form?
Explain the difference between quality control and quality assurance.
What are the differences between test strategy and test plan?
What are the key components of a bug report?
What are the actual QA processes run in software compamy ?
what is Conventional SPMs
What are the key challenges of software testing?
Hi I m working as a sqa engineer and after 1 yr i want to switch to system analyst side kindly tell me how both fields relate each other and is this easy to switch job from qa to system analyst and what's the difference b/w both fields.
What is the difference between test case and test data?
How does the Internal QA Audit relates with the ISO Standards level ?
How are the quality assurance activities planned ?
hi , This is krish from chennai . i like to do istqb certification for foundation level . if any one have material for that kidely help me. just send me the material to krishmca29@rediffmail.com. thanks is advance for sending .
Would we given training at first job (entry level)?