Answer Posted / sanjay kumar chatterjee
Mix design is a design mix that is made to acquire the
required strength as per particular requirement, the ratio
should be such that if 200Kg/cm2 is required than M20 is to
be designed, it is not a simple ratio mix of 1:2;4
or1;1.5:3 it depends on many factors
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is need for setting limits?
How did street originate in the plumbing term street ell?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
what is thumb rule for calculating the size of ISMB required for a particular length of span
What you understand by building codes?
Dear Sir What is the Contraction joint for base Slab
What are the responsibilities of a construction manager?
Explain why concrete barriers have curved surface profiles?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Permissible wastage of cement as per IS code ? In which IS code I get it?
what are RIB slabs explain about it
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
reinforcement slab, beam and column formulas?