Answer Posted / zulkifli abd. rahman
maximum demand is calculated and bill by a kW demand meter,
which record the highiest kW value consumed in one 30
minutes period, over a monthly billing cycle.
Is This Answer Correct ? | 12 Yes | 13 No |
Post New Answer View All Answers
define the active power?
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected
why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)
What are the advantages and disadvantages of short-pitched winding?
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
Comment on the working principle of operation of a single-phase transformer.
How can calculate the rating of a servo stabilizer for given a specific load
how we can calculate power factor in single phase & three phase ?thank u
How does an induction motor start?
What kind of socket shall be provided for window type air conditioner with cooling capacity upto 18000 BTU/hr
defult setting in p220 micom motor proction relay for 11kv,640kw,f.l.a.-40a,1440rpm ht motor?
What is difference between insulating medium and fault current interruption medium in a switching device.
either water sensor or flow meter,how we observe the water level, f any other equipment are in market ?
why and how voltage sharing in transformer, during magnetic balance test ?
Form S and "c" license application both are same? @ tneb portal