Cost of an item is x. It's value increases by p% and
decreases by p% Now the new value is 1 rupee, what is the
actual value ?
Answer Posted / v venu gopal
original cost is 100^2 / (100^2 - p^2) Rs
| Is This Answer Correct ? | 21 Yes | 5 No |
Post New Answer View All Answers
There are 1000 doors that are of the open-close type. When a person opens the door he closes it and then opens the other. When the first person goes he opens-closes the doors ion the multiples of 1 i.e., he opens and closes all the doors. When the second goes he opens and closes the doors 2, 4 6 8 rely. Similarly when the third one goes he does this for 3 6 9 12 15th doors rely. Find number of doors that are open at last.
A man is running around a rectangle it takes time 2 time in travelling length than travelling width total perimeter = 300. Find area.
500 men are arranged in an array of 10 rows and 50 columns . ALL tallest among each row are asked to fall out . And the shortest among THEM is A. Similarly after resuming that to their original positions that the shortest among each column are asked to fall out. And the longest among them is B . Now who is taller among A and B ?
slur : speech :: smulge : ?
what is the largest prime number in 8 digit number?
inept : clever :: languid :
If ABC =C3C3 and CAB = D3D3, Then find D3÷B3D3÷B3
f(X)= f(X-1)+f(X-2) FOR X>1 THEN X= ?
If the % of defective balls is 10% balls,and the number of defective balls is 5.The number of balls is
There are Brown and Black cows. In five days four black cows and 3 brown cows give as mush as milk that four brown cows and 5 black cows give in four days. If the black cow gives 10 litres of milk per day, how many liters of milk the Brown cow will give in one day? (Numbers are not certain)
A certain street has 500 buildings. A sign-maker is contracted to number the houses from 1 to 500. How many zeroes will he need?
sir , i hv done 85 correct question in ssc cgl-tier-i 2010 after checking through my source which is correct , tell me whether i m eleigible for tier-ii or not charan , jalandhar
8 persons A,B,C,D,E,F,G,H are sitting in a round dining table.some arrangement was given and position of H was asked.I don't remember the question exactly.
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
In a certain college, 20% of the boys and 40% of the girls attended the annual college outing. If 35% of all the students are boys, what percent of all the employees went to the outing?