Answer Posted / vinod
balance sheet is a statement which showing actualy
income /expenditure of company company is in profit/loss
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
In a group of 15,7 have studied Latin, 8 have studied Greek, and 3 have not studied either.How many of these studied both Latin and Greek
Pipe A can fill a tank in 30 mins and Pipe B can fill it in 28 mins.If 3/4th of the tank is filled by Pipe B alone and both are opened, how much time is required by both the pipes to fill the tank completely ?
If log 0.317=……… and log 0.318=………. Then find the value of log 0.319.
Why do we buy you?
A building with height D shadow upto G. What is the height of a neighbouring building with a shadow of C
A work is done by two people in 24 minutes. One of them alone can do it in 40 minutes. How much time will the other person will take to complete it
The minute hand of a clock overtakes the hour hand at intervals of 64 minutes of correct time. How much a day does the clock gain or lose?
The area of the quadrilateral is 36 What is a*b
which of the following leaders was not among the moderates
with 4/5 full tank vehicle travels 12 miles, with 1/3 full tank how much distance travels
If on an item a company gives 25% discount, they earn 25% profit. If they now give 10% discount, then wat % profit they make?
If the equation x2 - 3x + a = 0 has the roots (0,1) then value of a is ?
There are some 20 Basketball players & 30 Football players, and 25 cricket players. 1 of them plays all the three games. 8 of them plays at least two games. They are 50 altogether. How many of them plays none of the games.
How is the father of the man ,who is the brother of the only aunt of my brother related to me?
A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.