There are two sand clocks(timers) one complete totally in 7
minutes and other in 9-minutes we have to calculate with
this timers and bang the bell after completion of 11-
minutes!plz give me the solution.
Answer Posted / rayudu
You can ring the bell When the 7 min clock completes 10 min
and the 9 min clock completes 12 min
Sol: One complete round takes 8 min per both
If you ring the bell at 11 min First clock shows 10min and
second clock shows 12min
(10+12)/2=11min
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
What is functional specification?
What is pdr - peer design review?
Explain Peer Review in Software Testing?
What is difference between Agile and V model? Explain
What is metric?
how to download fullversion of JIRA(defect reporting s/w) s/w for free.can any provide web site for full version free download.
what is the meaning of Field Level Validation & Form Level Validation??
Demonstrated system testing experience in a large on-line environment – with at least 2 years experience including Development of test strategies development of test plans • execution of tests according to plans • defect management • using industry tools (eg HP Quality Centre formerly 'Mercury Quality Centre' (Test Director) , and • experience in interrogating and querying SQL server and Mainframe dtabases using tools such as RC Update, BRIO, SQL Server Management Studio
What is the purpose of exit criteria?
Explain usability testing?
What are the structure-based (white-box) testing techniques?
To test a function, what has to write a programmer, which calls the function to be tested and pass test data.
How the 2 wings and body of the butterfly model of test development is represented?
What is system?
What is boundary value?