Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

thermal power station operation in general

Answer Posted / gaurav srivastava

the thermal power station is based on modified rankine
cycle, where the coal burnt in the boiler to produce the
vapour by water..In boiler water heated to supersaturated
pointed where it in imposed on turbine by a nozzle .. the
nozzle is used to produce high velocity of steam to run the
impulse turbine .. with turbine a generator is combine
which is generate the electricity ..which is transport
through by wire....bur before transformation of electricity
a step up transformer is used to step high potential of
electricity ......

Is This Answer Correct ?    49 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

2173


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating

2355


Pls explan the OLR setting in VCB at HT yard

2636


why is a power transformer used only occasionally?it is used to step up at generating stations?and that needs to be done all day long !!!!!!!

1814


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1796


Parts of machine and their discription in details with suitable photo

1999


what is ratio of copper wire size and current ?

1767


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

2057


We have Diesel generator of 200KW. fuel consumption is always same,even connected light load or full load. Is it right?

2120


how load of a turbo generator can be increased

1892


how can i change the rotation of the AC single phase induction motor and show me by diagram

1733


what is static frequency converter?what is the function...of sfc...?

2176


Why air circuit breaker off due to power failure?

1134


what is the difference between gas group b and gas group c electrical equipment construction wise?

1808


WHY EXCITER PHASE SEQUENCE ARE OPPOSITE THAN STATOR SUPPLY PHASE SEQUENCE IN SYNCHRONOUS MOTOR >

1851