why 1.25 factor is to be multiplied to cylindrical strength
of concrete while getting the equvalent cubical strength of
concrete?
Answer Posted / gaurav
1.standard cube has a ht/width ratio of 1 and std cyl has
the same ratio of 2 . cube registers a higher compressive
str than cyl which is approx 1.25 times more hense the
multiplications .
| Is This Answer Correct ? | 16 Yes | 8 No |
Post New Answer View All Answers
How much does the leaning tower of pisa lean?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is limit state method and working stress method and ultimate method
What is Rankine Cycle?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
What are the techniques to measure road difference?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
sir how can we find the cement and sand required for making 4" drop
When was the first motorway built in england?
what is idealized curve for concrere and steel
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Where is the worlds longest elevator and how long is it?
Prepare a Schedule for a Highrised building from starting stage to Handover?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
rate analysis hiring of generator 62.5 KVA