what we happen if 400 kvar cpacitor banks are on in manual
mode and there is no load on mains ??????????????
Answer Posted / chandra
The load power factor becomes leading and load becomes
source and power is supplying to the system instead of
receiving.
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Tell me the reason of connecting domestic t/f primary in star or delta,and also secondary side.
What was the Dg set radiator and lube oil temperatures trip in ACB
how to find the capacitance value of the motor while running??
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!
When we need up only in o/p 440v, so why we use directly in 11kva in input?
What is the principal of motor?
what are the problems that generally occur in power flows??
what is the difference b/w UHVDC and HVDC(LIGHT)?
what do you mean by type zero control sytem ?Give an practical example of type zero contol sytem?
How to calculate the Efficiency of Chiller
how to determine the inrush current of a transformer
explain the what is a drive ? 0 4 which type motor r use in the celling fan..... PCB plannet 2 13 If stator & rotor of a 3-phase induction motor have different no. of poles, will the motor run or not?? types of drives Why dc supply is used for closing and tripping coil of ht breakers. What happen if we use only ups ac supply only. ACC 1 41 how the 3phase induction motor is running in 2phase supply with help of capacitor? 1 33 what is the actual difference betwen constructional details and constructional features? 1 20 how does commutator convert a.c to d.c?
what is maxemo work permit procedure
How to calculate no of EARTH PIT? Describe the formula as per IS standard?