WHAT IS THE DIFFERENCE BETWEEN PLC AND DCS
Answer Posted / abdus sattar mollah
The answer is:
WHAT IS THE DIFFERENCE BETWEEN 'CELL' AND 'TISSUE'?
HERE:CELL===PLC
AND
TISSUE====DCS
Is This Answer Correct ? | 20 Yes | 46 No |
Post New Answer View All Answers
Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.
how to convert MA in to measuring values..and how mwasuring values into MA ?..plz ansr.i have intervw
how we are selecting instuments by differentiating certain instruments in 4 to 20 ma range and certain in 1 to 5 v dc
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
hi friends,im an instrumentation and contol engg student,can u hlp me of suggsting barc written question paper,my id is roysuvaranjan@gmail.com, cel no.9563591747
Draw a P& ID showing – orifice flange, plate, dp transmitter, isolation & bypass valves and tubing.
what about your moleg in pogrees with company
when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??
What is 3 selection available when configure the burnout protection for controller
TEMPERATURE VARIATION FOR FREQUENTLY.
What is 1:1 redundancy ?
What types of Instrumentation Related Questions can an Interviewer ask in a Telephonic Interview ?
Which type of pressure can be measured by these elements?
Please can anybody help for control valve sizing step by step procedure?
we have level transmitter for h2s04 storage tank capacity 10k ,always there are failure of transmitter due to failure of magnetic floats ,please come up with solutions at the earliest.