WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED
FOOTING??
Answer Posted / vkadian
after that we can design dimensions of footinf.
| Is This Answer Correct ? | 10 Yes | 11 No |
Post New Answer View All Answers
What is need for setting limits?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Define What is rigging?
Howmuch bend to be provide for 200/600 BEEM
What are the different approaches in designing the floors of the service reservoirs?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
How much 1 cum of M15, M20 & M25 concrete weigh?
silt%= silt volume/ silt+sand volume is this right?
why the openings of sieves are square io size?
how much of the strength comes from post-production curing
How much cement and sand required for 9"brick wall per square metre
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate