Answer Posted / mr gauge
We use 4mA instead of zero because 4mA is a minimum current
required to power up the transmitter, positioner etc. How do
we get the device turn on with no current.
Is This Answer Correct ? | 7 Yes | 34 No |
Post New Answer View All Answers
Explain about the leakage class of the control valves
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..
Difference between dcs and plc including date processing and architecture.
Explain the difference between plc and cnc?
Draw a complete P&ID of a flow suction tank indicating all control & protection equipment. Indicate all its inlets and outlets. Explain the controls for this system
what is the difference between Cv and air consumption? why the customer needs Air consumption details?
What is the principle of capacitance type level transmitter?
why we use cascade control and feed foreword control in 3 element control of boiler drum ?what is feed forward and cascade control system ?
What is the procedure of calibration of Load cell?
i want formula for flow control.am doing project in flow control using orifice . i know value of the flow level(Q) . upstream(p1) pressure, orifice diameter(Do) , pipe diameter(Di) and oil viscosity(Vi) how can i calculate downstream pressure
I faced several time siemens ps2 positioner automatically getting Chang in it's set point direction after auto calibration So is there any causes biside this or any permissives ?
What care will you take in the installation of control valves,SCADA,DCS and FOC in Oil and Gas Project?
What are the type of bonnets in the control valves?
Why do you want to work here