Answer Posted / sandeep bisen
due to achieving maximum linearity in between 4- 20 ma.
| Is This Answer Correct ? | 9 Yes | 11 No |
Post New Answer View All Answers
Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method
Load break swicth maintenance procedure.
On Which Pressure PRV is operated.
TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.
does the Trivector Meter of three phase automatically takes care of the low power factor and gives the reading accordigly or it does not take care of the Power factor while giving the readings please explain
please send me previous year questions of jspl through which i could prepare myself for the test.
What is the need for a controller?
could you measure current in parallel?
Starting Time of LT & HT Motor
what is POTT and PUTT explain?
What should be the length of transmission line so that we can see/obtain the full sine wave of voltage??
why we are using Load factor?
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
write down the formula of cable size in RM if current is 50Amp.
Why electrical power generation and transmission done in 3 phase system not more than 3 phase ?