As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / rqn
if you are with the inspection team, the proper way is to
deduct the cost of the item involve based on the gravity of
damage, however, you have also to consider on the effect of
the item involve with respect to the time element in
completing the project and the structural stability.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
how much required strength of cement concrete bricks(size 230x115x75mm)
In which code the the maximum height of concrete casting has been explained
Civil engineering related
Exterior Joints,define
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
how to convert sand in Cft to Kgs
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
The 4 main factors to start a construction project are––
What is need for setting limits?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Please tell me vasthu room sizes. Thanks.
Formula of mid span bar
How foundation is designed, Column design and beam design