As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / rqn
if you are with the inspection team, the proper way is to
deduct the cost of the item involve based on the gravity of
damage, however, you have also to consider on the effect of
the item involve with respect to the time element in
completing the project and the structural stability.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What is rigging?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What is the quantity of cement in mix m20 concrete?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What quantity of 1.0 m3 bricks required?
what discoveries did you have in relation to your course?
How many days should curing of plastering, brick work and concrete
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what motivates you to do a good job
what are the values of compressieve strenght?
What is portland cement
whou haat goals do you have in your career