Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Pls say , how we calculate lux / sq.ft, which formula used
for calculation

Answer Posted / sudheer

we can calculate lux level by lux meter.

Total lumens required= A . E . D/U where,
A = surface area(sq.m)
E= illumination(lm/sq.m)
D= dipriciation factor
U= co-efficient of utilization

Is This Answer Correct ?    38 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why transformer used in UPS??

1527


Refernce currents are to be generated using refernce cueernts how can this be done??

1952


i am completed diploma in ece,and working in ht and lt lines.so is elligible diploma in ece for get electrical C Licence?plse give ur opinion?

1836


how unidirectional torque is produced in DC motor?

6728


how does commutator convert a.c to d.c?

2153


what is meant by directional earth fault and non directional earth fault? describe both.

1841


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

2421


Convert a star connected network into a delta connected network.

1061


What is BusBar integrity test and how it is conducted?

2156


what is the safety points of vaccum circuit breaker.

2024


sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason

1419


How to calculate loses in transformer of 160 KVA ?

1609


1.What will be stored in online ups EPROM IC?

1993


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1292


for 750 kw LT load what will be the ht kva

1594