Based on CPI/CGPA they shortlist the candidates & than
directly start Interview so there is no Written Exam or GD
Only PI.Interview held @ MNNIT , ALLAHABAD On-Campus on
6th,Aug, 2007 & the Questions asked to me by Interview Board
( 4 People) are from HR/SummerTraining/BTP/Subject-core,
POWER SYSTEM & MACHINE. time duration of I/V is about 15-20
Minutes.

HR-

Q.1 Name,hobbies & About family background ?

Q2.What u know abt NTPC ??

Q3.Why u want to choose NTPC as ur Carrier's starting i.e
power sector not any other Oragnisation or sector ??

Techincal Questions-

Q1.What is the reason for transformer Noise ??

Q2.Which material is used for making Transformer oil & How u
measure its dielectric strength & Name the test ?

Q.3 Which Machine u will prefer 2 use if flammble gases are
coming out at a place & why ??

Q4.What is relation b/w Transmission Lines & Communication
Lines ?

Q5.What is the maximum capacity Synchronus Machine & total
powerGeneration in our country ?

Q.6 In india Power generation is at 50Hz while in America
its 60 hz ,why so ?? Advantage or disadvantage ??

Q.7 Maximum Generation Voltage in india ?

Q8. What is the Voltage regulation & why its required n how
much is permissible ? & causes of voltage variation ??

Q.9 Why electric shock is feel ?? n in a Electric Train why
we didnt feel that ?

Q.10 Have u seen/ experience of any power plant/ industry
related to the power sector ?

so these are the questions which not too diffcult i
think was asked to me.

Answer Posted / divya

Can you please give me the answer for Q) 3, 5, 7, 9

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why we make earth connection with Transformer Body and What will be the minimum size of copper wire as per code with respect to KVA rating of Transformer?

1289


if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.

1134


what is the chemical name and formula of refrigarent R-134a.

1772


Define coil span?

634


Which device is used for the source of emission of electrons in a crt?

727






Explain advantages of storage batteries

643


what kind of technical test that i need to learn because i have an interview tomorrow.. please someone help me..

1490


what is meant by surge? what we called for high currents?

1490


For RCD (Residual current device) Icu is defined. How i can find Ics for them?

1599


how we will deside the high voltage value

1456


what is the effect of vector group while phase sequence of a generator changes,whether the vector group changes or not

1613


What type of a DC motor would you use for a lift?

668


What is cable tray, its type, and its support?

666


explain the Trip supervision circuit

1656


HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?

1618